Durango Ford
AvailableEV charging station in Durango, Colorado on the Ford Charge network — 4 DC fast. US DOE AFDC station 373980.
At a glance
Durango Ford is a public EV charging station at 1200 Carbon Jct a in Durango, Colorado, on the Ford Charge network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Oct 17, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 373980 |
| Network | Ford Charge |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Oct 17, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Durango, CO8 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Gauge Apartment S2 Station2 ports
ChargePoint · Available
- Gauge Apartment Two Ada2 ports
ChargePoint · Available
- Gauge Apartment N Station2 ports
ChargePoint · Available
What kind of charging does Durango Ford offer?
Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 41% above the Colorado average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.
How does Durango Ford compare with other stations in Durango?
Durango has 44 charging stations in the DOE registry with 98 ports, the 16th-most of 204 cities and towns in Colorado. Durango Ford accounts for 4% of the charging ports in Durango. It is the only Ford Charge station in Durango. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Durango Ford?
Ford Charge operates 357 stations in the registry across 46 states, with 1,288 DC fast and 2 Level 2 ports in total. 3 of those stations are in Colorado, under 1% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 17, 2024, one of 381 stations in Colorado with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Durango Ford have?
Durango Ford has 4 charging ports: 4 DC fast.
Does Durango Ford have DC fast charging?
Yes. The registry lists 4 DC fast ports at Durango Ford, with CCS connectors.
What connectors does Durango Ford have?
Durango Ford has CCS connectors.
Is Durango Ford open to the public?
Yes. Durango Ford is listed with public access, and its status is available.
Where is Durango Ford?
Durango Ford is at 1200 Carbon Jct a, Durango, CO 81301. Its coordinates are 37.22944, -107.85994.
More EV charging around Durango
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 373980, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Durango Ford, Durango, CO (AFDC station 373980)”, https://chargecensus.com/stations/colorado/durango-ford-373980 (data as of October 12, 2026).