Coscc Embassy Suites
AvailableEV charging station in Colorado Springs, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 143461.
At a glance
Coscc Embassy Suites is a public EV charging station at 7290 Commerce Center Dr in Colorado Springs, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 15, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 143461 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 15, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 7290 Commerce Center Dr
- City
- Colorado Springs
- State
- Colorado
- ZIP
- 80919
- Coordinates
- 38.93662, -104.81467
Within ~15 km
Nearby charging
- The Broadmoor EVSE 1-2929 ports
PowerFlex · Available
Tesla Destination · Available
Tesla Supercharger · Available
- The Aven12 ports
Blink · Available
Tesla Supercharger · Available
- Phil Long EV Outlet10 ports
evGateway · Available
What kind of charging does Coscc Embassy Suites offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Coscc Embassy Suites compare with other stations in Colorado Springs?
Colorado Springs has 120 charging stations in the DOE registry with 394 ports, the 3rd-most of 204 cities and towns in Colorado. Coscc Embassy Suites accounts for under 1% of the charging ports in Colorado Springs. ChargePoint runs 66 stations in Colorado Springs. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Coscc Embassy Suites?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2019, one of 94 stations in Colorado with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Coscc Embassy Suites have?
Coscc Embassy Suites has 2 charging ports: 2 Level 2.
Does Coscc Embassy Suites have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Coscc Embassy Suites have?
Coscc Embassy Suites has J1772 connectors.
Is Coscc Embassy Suites open to the public?
Yes. Coscc Embassy Suites is listed with public access, and its status is available.
Where is Coscc Embassy Suites?
Coscc Embassy Suites is at 7290 Commerce Center Dr, Colorado Springs, CO 80919. Its coordinates are 38.93662, -104.81467.
More EV charging around Colorado Springs
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 143461, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Coscc Embassy Suites, Colorado Springs, CO (AFDC station 143461)”, https://chargecensus.com/stations/colorado/coscc-embassy-suites-143461 (data as of October 12, 2026).