Core Sedalia Hartsel_dcnorth
AvailableEV charging station in Hartsel, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 459889.
At a glance
Core Sedalia Hartsel_dcnorth is a public EV charging station at 88 Valley Drive in Hartsel, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 20, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 459889 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 20, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 88 Valley Drive
- City
- Hartsel
- State
- Colorado
- ZIP
- 80449
- Coordinates
- 39.02188, -105.79530
Within ~15 km
Nearby charging
- Core Sedalia Hartsel_dcsouth1 ports
ChargePoint · Available
What kind of charging does Core Sedalia Hartsel_dcnorth offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Core Sedalia Hartsel_dcnorth compare with other stations in Hartsel?
Hartsel has 2 charging stations in the DOE registry with 2 ports. Core Sedalia Hartsel_dcnorth accounts for 50% of the charging ports in Hartsel. ChargePoint runs 2 stations in Hartsel. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Core Sedalia Hartsel_dcnorth?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 20, 2026, one of 432 stations in Colorado with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Core Sedalia Hartsel_dcnorth have?
Core Sedalia Hartsel_dcnorth has 1 charging port: 1 DC fast.
Does Core Sedalia Hartsel_dcnorth have DC fast charging?
Yes. The registry lists 1 DC fast port at Core Sedalia Hartsel_dcnorth, with CHAdeMO and CCS connectors.
What connectors does Core Sedalia Hartsel_dcnorth have?
Core Sedalia Hartsel_dcnorth has CHAdeMO and CCS connectors.
Is Core Sedalia Hartsel_dcnorth open to the public?
Yes. Core Sedalia Hartsel_dcnorth is listed with public access, and its status is available.
Where is Core Sedalia Hartsel_dcnorth?
Core Sedalia Hartsel_dcnorth is at 88 Valley Drive, Hartsel, CO 80449. Its coordinates are 39.02188, -105.79530.
More EV charging around Hartsel
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 459889, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Core Sedalia Hartsel_dcnorth, Hartsel, CO (AFDC station 459889)”, https://chargecensus.com/stations/colorado/core-sedalia-hartsel-dcnorth-459889 (data as of October 12, 2026).