Core Sedalia Deer Trail2
AvailableEV charging station in Deer Trail, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 326713.
At a glance
Core Sedalia Deer Trail2 is a public EV charging station at 555 2nd Ave in Deer Trail, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 26, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 326713 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 26, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 555 2nd Ave
- City
- Deer Trail
- State
- Colorado
- ZIP
- 80105
- Coordinates
- 39.61366, -104.04531
Within ~15 km
Nearby charging
- Core Sedalia Deer Trail11 ports
ChargePoint · Available
What kind of charging does Core Sedalia Deer Trail2 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Core Sedalia Deer Trail2 compare with other stations in Deer Trail?
Deer Trail has 2 charging stations in the DOE registry with 2 ports. Core Sedalia Deer Trail2 accounts for 50% of the charging ports in Deer Trail. ChargePoint runs 2 stations in Deer Trail. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Core Sedalia Deer Trail2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 26, 2024, one of 381 stations in Colorado with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Core Sedalia Deer Trail2 have?
Core Sedalia Deer Trail2 has 1 charging port: 1 DC fast.
Does Core Sedalia Deer Trail2 have DC fast charging?
Yes. The registry lists 1 DC fast port at Core Sedalia Deer Trail2, with CHAdeMO and CCS connectors.
What connectors does Core Sedalia Deer Trail2 have?
Core Sedalia Deer Trail2 has CHAdeMO and CCS connectors.
Is Core Sedalia Deer Trail2 open to the public?
Yes. Core Sedalia Deer Trail2 is listed with public access, and its status is available.
Where is Core Sedalia Deer Trail2?
Core Sedalia Deer Trail2 is at 555 2nd Ave, Deer Trail, CO 80105. Its coordinates are 39.61366, -104.04531.
More EV charging around Deer Trail
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 326713, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Core Sedalia Deer Trail2, Deer Trail, CO (AFDC station 326713)”, https://chargecensus.com/stations/colorado/core-sedalia-deer-trail2-326713 (data as of October 12, 2026).