Core Sedalia Dc_miller_bld N
AvailableEV charging station in Castle Rock, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 384777.
At a glance
Core Sedalia Dc_miller_bld N is a public EV charging station at 100 Third Street in Castle Rock, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 22, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 384777 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 22, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Third Street
- City
- Castle Rock
- State
- Colorado
- ZIP
- 80104
- Coordinates
- 39.37267, -104.86213
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Encore CR6 ports
Blink · Available
EVgo · Available
Blink · Available
Electrify America · Available
EV Connect · Temporarily unavailable
What kind of charging does Core Sedalia Dc_miller_bld N offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Core Sedalia Dc_miller_bld N compare with other stations in Castle Rock?
Castle Rock has 20 charging stations in the DOE registry with 64 ports. Core Sedalia Dc_miller_bld N accounts for 3% of the charging ports in Castle Rock. ChargePoint runs 12 stations in Castle Rock. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Core Sedalia Dc_miller_bld N?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 22, 2025, one of 568 stations in Colorado with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Core Sedalia Dc_miller_bld N have?
Core Sedalia Dc_miller_bld N has 2 charging ports: 2 Level 2.
Does Core Sedalia Dc_miller_bld N have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Core Sedalia Dc_miller_bld N have?
Core Sedalia Dc_miller_bld N has J1772 connectors.
Is Core Sedalia Dc_miller_bld N open to the public?
Yes. Core Sedalia Dc_miller_bld N is listed with public access, and its status is available.
Where is Core Sedalia Dc_miller_bld N?
Core Sedalia Dc_miller_bld N is at 100 Third Street, Castle Rock, CO 80104. Its coordinates are 39.37267, -104.86213.
More EV charging around Castle Rock
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 384777, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Core Sedalia Dc_miller_bld N, Castle Rock, CO (AFDC station 384777)”, https://chargecensus.com/stations/colorado/core-sedalia-dc-miller-bld-n-384777 (data as of October 12, 2026).