Comntco Ve West 1
AvailableEV charging station in Edwards, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 348175.
At a glance
Comntco Ve West 1 is a public EV charging station at 150 Miller Ranch Rd in Edwards, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 20, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 348175 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 20, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Destination · Available
- Edwards, CO - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Arrowhead Ski Area8 ports
AmpUp · Available
Tesla Destination · Available
Tesla Destination · Available
Electrify America · Available
What kind of charging does Comntco Ve West 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Comntco Ve West 1 compare with other stations in Edwards?
Edwards has 28 charging stations in the DOE registry with 70 ports. Comntco Ve West 1 accounts for 3% of the charging ports in Edwards. ChargePoint runs 23 stations in Edwards. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Comntco Ve West 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 20, 2024, one of 381 stations in Colorado with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Comntco Ve West 1 have?
Comntco Ve West 1 has 2 charging ports: 2 Level 2.
Does Comntco Ve West 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Comntco Ve West 1 have?
Comntco Ve West 1 has J1772 connectors.
Is Comntco Ve West 1 open to the public?
Yes. Comntco Ve West 1 is listed with public access, and its status is available.
Where is Comntco Ve West 1?
Comntco Ve West 1 is at 150 Miller Ranch Rd, Edwards, CO 81632. Its coordinates are 39.64642, -106.58793.
More EV charging around Edwards
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 348175, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Comntco Ve West 1, Edwards, CO (AFDC station 348175)”, https://chargecensus.com/stations/colorado/comntco-ve-west-1-348175 (data as of October 12, 2026).