EV charging station in Severance, Colorado on the ChargePoint network — 2 DC fast. US DOE AFDC station 417409.

At a glance

Co Xeo Severance 1 is a public EV charging station at 7 Timber Ridge Parkway in Severance, Colorado, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 1, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID417409
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 1, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
7 Timber Ridge Parkway
City
Severance
ZIP
80550
Coordinates
40.52250, -104.86189

Within ~15 km

Nearby charging

What kind of charging does Co Xeo Severance 1 offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Co Xeo Severance 1 compare with other stations in Severance?

Severance has 3 charging stations in the DOE registry with 6 ports. Co Xeo Severance 1 accounts for 33% of the charging ports in Severance. ChargePoint runs 2 stations in Severance. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Co Xeo Severance 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 1, 2025, one of 568 stations in Colorado with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Co Xeo Severance 1 have?

Co Xeo Severance 1 has 2 charging ports: 2 DC fast.

Does Co Xeo Severance 1 have DC fast charging?

Yes. The registry lists 2 DC fast ports at Co Xeo Severance 1, with CHAdeMO and CCS connectors.

What connectors does Co Xeo Severance 1 have?

Co Xeo Severance 1 has CHAdeMO and CCS connectors.

Is Co Xeo Severance 1 open to the public?

Yes. Co Xeo Severance 1 is listed with public access, and its status is available.

Where is Co Xeo Severance 1?

Co Xeo Severance 1 is at 7 Timber Ridge Parkway, Severance, CO 80550. Its coordinates are 40.52250, -104.86189.

More EV charging around Severance

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 417409, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Co Xeo Severance 1, Severance, CO (AFDC station 417409)”, https://chargecensus.com/stations/colorado/co-xeo-severance-1-417409 (data as of October 12, 2026).