ChargeCensus

City Of Aspen Paepcke L2

Temporarily unavailable

EV charging station in Aspen, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 420277.

At a glance

City Of Aspen Paepcke L2 is a public EV charging station at 100 North Garmisch Street in Aspen, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Aug 21, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID420277
NetworkChargePoint
StatusTemporarily unavailable (T)
AccessPublic
Open dateAug 21, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
100 North Garmisch Street
City
Aspen
ZIP
81611
Coordinates
39.19087, -106.82283

Within ~15 km

Nearby charging

What kind of charging does City Of Aspen Paepcke L2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does City Of Aspen Paepcke L2 compare with other stations in Aspen?

Aspen has 57 charging stations in the DOE registry with 118 ports, the 13th-most of 204 cities and towns in Colorado. City Of Aspen Paepcke L2 accounts for 2% of the charging ports in Aspen. ChargePoint runs 43 stations in Aspen. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates City Of Aspen Paepcke L2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 21, 2025, one of 568 stations in Colorado with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Of Aspen Paepcke L2 have?

City Of Aspen Paepcke L2 has 2 charging ports: 2 Level 2.

Does City Of Aspen Paepcke L2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City Of Aspen Paepcke L2 have?

City Of Aspen Paepcke L2 has J1772 connectors.

Is City Of Aspen Paepcke L2 open to the public?

Yes. City Of Aspen Paepcke L2 is listed with public access, and its status is temporarily unavailable.

Where is City Of Aspen Paepcke L2?

City Of Aspen Paepcke L2 is at 100 North Garmisch Street, Aspen, CO 81611. Its coordinates are 39.19087, -106.82283.

More EV charging around Aspen

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 420277, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Of Aspen Paepcke L2, Aspen, CO (AFDC station 420277)”, https://chargecensus.com/stations/colorado/city-of-aspen-paepcke-l2-420277 (data as of October 12, 2026).