Chrgwestcliffe Level2 01
AvailableEV charging station in Westcliffe, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 405313.
At a glance
Chrgwestcliffe Level2 01 is a public EV charging station at 309 CO-69 in Westcliffe, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 3, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 405313 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 3, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 309 CO-69
- City
- Westcliffe
- State
- Colorado
- ZIP
- 81252
- Coordinates
- 38.13660, -105.46640
Within ~15 km
Nearby charging
- Courtyard Country Inn2 ports
Rivian Waypoints · Available
- Tsc Ct4k2 ports
ChargePoint · Available
- Tony White Station 11 ports
ChargePoint · Temporarily unavailable
- Tsc Cpe2501 ports
ChargePoint · Available
What kind of charging does Chrgwestcliffe Level2 01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Chrgwestcliffe Level2 01 compare with other stations in Westcliffe?
Westcliffe has 3 charging stations in the DOE registry with 5 ports. Chrgwestcliffe Level2 01 accounts for 40% of the charging ports in Westcliffe. ChargePoint runs 2 stations in Westcliffe. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Chrgwestcliffe Level2 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 3, 2025, one of 568 stations in Colorado with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Chrgwestcliffe Level2 01 have?
Chrgwestcliffe Level2 01 has 2 charging ports: 2 Level 2.
Does Chrgwestcliffe Level2 01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Chrgwestcliffe Level2 01 have?
Chrgwestcliffe Level2 01 has J1772 connectors.
Is Chrgwestcliffe Level2 01 open to the public?
Yes. Chrgwestcliffe Level2 01 is listed with public access, and its status is available.
Where is Chrgwestcliffe Level2 01?
Chrgwestcliffe Level2 01 is at 309 CO-69, Westcliffe, CO 81252. Its coordinates are 38.13660, -105.46640.
More EV charging around Westcliffe
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 405313, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Chrgwestcliffe Level2 01, Westcliffe, CO (AFDC station 405313)”, https://chargecensus.com/stations/colorado/chrgwestcliffe-level2-01-405313 (data as of October 12, 2026).