Breckenridge Town Hall 1
AvailableEV charging station in Breckenridge, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 165363.
At a glance
Breckenridge Town Hall 1 is a public EV charging station at 150 Ski Hill Rd in Breckenridge, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 21, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 165363 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 21, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 150 Ski Hill Rd
- City
- Breckenridge
- State
- Colorado
- ZIP
- 80424
- Coordinates
- 39.48249, -106.04821
Within ~15 km
Nearby charging
- – Main Street Station14 ports
Blink · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Sol Center Station5 ports
ChargePoint · Available
Tesla Destination · Available
What kind of charging does Breckenridge Town Hall 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Breckenridge Town Hall 1 compare with other stations in Breckenridge?
Breckenridge has 63 charging stations in the DOE registry with 136 ports, the 12th-most of 204 cities and towns in Colorado. Breckenridge Town Hall 1 accounts for 1% of the charging ports in Breckenridge. ChargePoint runs 54 stations in Breckenridge. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Breckenridge Town Hall 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 21, 2020, one of 215 stations in Colorado with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Breckenridge Town Hall 1 have?
Breckenridge Town Hall 1 has 2 charging ports: 2 Level 2.
Does Breckenridge Town Hall 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Breckenridge Town Hall 1 have?
Breckenridge Town Hall 1 has J1772 connectors.
Is Breckenridge Town Hall 1 open to the public?
Yes. Breckenridge Town Hall 1 is listed with public access, and its status is available.
Where is Breckenridge Town Hall 1?
Breckenridge Town Hall 1 is at 150 Ski Hill Rd, Breckenridge, CO 80424. Its coordinates are 39.48249, -106.04821.
More EV charging around Breckenridge
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 165363, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Breckenridge Town Hall 1, Breckenridge, CO (AFDC station 165363)”, https://chargecensus.com/stations/colorado/breckenridge-town-hall-1-165363 (data as of October 12, 2026).