ChargeCensus

Bdo Public Bennett Dc2

Available

EV charging station in Bennett, Colorado on the ChargePoint network — 1 DC fast. US DOE AFDC station 199137.

At a glance

Bdo Public Bennett Dc2 is a public EV charging station at 1092 cedar street in Bennett, Colorado, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 27, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID199137
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1092 cedar street
City
Bennett
ZIP
80102
Coordinates
39.74268, -104.43063

Within ~15 km

Nearby charging

What kind of charging does Bdo Public Bennett Dc2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Bdo Public Bennett Dc2 compare with other stations in Bennett?

Bennett has 4 charging stations in the DOE registry with 6 ports. Bdo Public Bennett Dc2 accounts for 17% of the charging ports in Bennett. ChargePoint runs 4 stations in Bennett. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Bdo Public Bennett Dc2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 27, 2021, one of 450 stations in Colorado with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bdo Public Bennett Dc2 have?

Bdo Public Bennett Dc2 has 1 charging port: 1 DC fast.

Does Bdo Public Bennett Dc2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Bdo Public Bennett Dc2, with CHAdeMO and CCS connectors.

What connectors does Bdo Public Bennett Dc2 have?

Bdo Public Bennett Dc2 has CHAdeMO and CCS connectors.

Is Bdo Public Bennett Dc2 open to the public?

Yes. Bdo Public Bennett Dc2 is listed with public access, and its status is available.

Where is Bdo Public Bennett Dc2?

Bdo Public Bennett Dc2 is at 1092 cedar street, Bennett, CO 80102. Its coordinates are 39.74268, -104.43063.

More EV charging around Bennett

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 199137, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bdo Public Bennett Dc2, Bennett, CO (AFDC station 199137)”, https://chargecensus.com/stations/colorado/bdo-public-bennett-dc2-199137 (data as of October 12, 2026).