ChargeCensus

Arapahoe Basin Station 2

Available

EV charging station in Dillon, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 205204.

At a glance

Arapahoe Basin Station 2 is a public EV charging station at 28194 US-6 in Dillon, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 22, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID205204
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 22, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
28194 US-6
City
Dillon
ZIP
80435
Coordinates
39.64242, -105.87246

Within ~15 km

Nearby charging

What kind of charging does Arapahoe Basin Station 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Arapahoe Basin Station 2 compare with other stations in Dillon?

Dillon has 8 charging stations in the DOE registry with 16 ports. Arapahoe Basin Station 2 accounts for 13% of the charging ports in Dillon. ChargePoint runs 6 stations in Dillon. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Arapahoe Basin Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 22, 2022, one of 297 stations in Colorado with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Arapahoe Basin Station 2 have?

Arapahoe Basin Station 2 has 2 charging ports: 2 Level 2.

Does Arapahoe Basin Station 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Arapahoe Basin Station 2 have?

Arapahoe Basin Station 2 has J1772 connectors.

Is Arapahoe Basin Station 2 open to the public?

Yes. Arapahoe Basin Station 2 is listed with public access, and its status is available.

Where is Arapahoe Basin Station 2?

Arapahoe Basin Station 2 is at 28194 US-6, Dillon, CO 80435. Its coordinates are 39.64242, -105.87246.

More EV charging around Dillon

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 205204, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Arapahoe Basin Station 2, Dillon, CO (AFDC station 205204)”, https://chargecensus.com/stations/colorado/arapahoe-basin-station-2-205204 (data as of October 12, 2026).