Ac Government 2
AvailableEV charging station in Brighton, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 85644.
At a glance
Ac Government 2 is a public EV charging station at 4430 S Adams County Pkwy in Brighton, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 23, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 85644 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 23, 2017 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Wdn61 ports
PowerFlex · Available
- DHL Express EVSE 1-5959 ports
PowerFlex · Available
Tesla Destination · Available
Non-networked · Available
Non-networked · Available
- Commerce City (Fleet-ZERO) DCFC22 ports
Shell Recharge · Planned
What kind of charging does Ac Government 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ac Government 2 compare with other stations in Brighton?
Brighton has 44 charging stations in the DOE registry with 92 ports, the 18th-most of 204 cities and towns in Colorado. Ac Government 2 accounts for 2% of the charging ports in Brighton. ChargePoint runs 39 stations in Brighton. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Ac Government 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2017, one of 71 stations in Colorado with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ac Government 2 have?
Ac Government 2 has 2 charging ports: 2 Level 2.
Does Ac Government 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ac Government 2 have?
Ac Government 2 has J1772 connectors.
Is Ac Government 2 open to the public?
Yes. Ac Government 2 is listed with public access, and its status is available.
Where is Ac Government 2?
Ac Government 2 is at 4430 S Adams County Pkwy, Brighton, CO 80601. Its coordinates are 39.92287, -104.81291.
More EV charging around Brighton
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 85644, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ac Government 2, Brighton, CO (AFDC station 85644)”, https://chargecensus.com/stations/colorado/ac-government-2-85644 (data as of October 12, 2026).