ChargeCensus

Vw Hyundai Cpe250 #1

Available

EV charging station in Modesto, California on the ChargePoint network — 1 DC fast. US DOE AFDC station 254044.

At a glance

Vw Hyundai Cpe250 #1 is a public EV charging station at 4620 McHenry Ave in Modesto, California, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Feb 15, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID254044
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 15, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
4620 McHenry Ave
ZIP
95356
Coordinates
37.70601, -120.99424

Within ~15 km

Nearby charging

What kind of charging does Vw Hyundai Cpe250 #1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Vw Hyundai Cpe250 #1 compare with other stations in Modesto?

Modesto has 47 charging stations in the DOE registry with 185 ports. Vw Hyundai Cpe250 #1 accounts for under 1% of the charging ports in Modesto. ChargePoint runs 23 stations in Modesto. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Vw Hyundai Cpe250 #1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 15, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Vw Hyundai Cpe250 #1 have?

Vw Hyundai Cpe250 #1 has 1 charging port: 1 DC fast.

Does Vw Hyundai Cpe250 #1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Vw Hyundai Cpe250 #1, with CHAdeMO and CCS connectors.

What connectors does Vw Hyundai Cpe250 #1 have?

Vw Hyundai Cpe250 #1 has CHAdeMO and CCS connectors.

Is Vw Hyundai Cpe250 #1 open to the public?

Yes. Vw Hyundai Cpe250 #1 is listed with public access, and its status is available.

Where is Vw Hyundai Cpe250 #1?

Vw Hyundai Cpe250 #1 is at 4620 McHenry Ave, Modesto, CA 95356. Its coordinates are 37.70601, -120.99424.

More EV charging around Modesto

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 254044, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Vw Hyundai Cpe250 #1, Modesto, CA (AFDC station 254044)”, https://chargecensus.com/stations/california/vw-hyundai-cpe250-1-254044 (data as of October 12, 2026).