Vacaville MOB
AvailableEV charging station in Vacaville, California on the Electrify America network — 2 Level 2. US DOE AFDC station 458470.
At a glance
Vacaville MOB is a public EV charging station at 1 Quality Dr in Vacaville, California, on the Electrify America network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 30, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458470 |
| Network | Electrify America |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 30, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Charging network
Operates 1,221 stations in the DOE registry — view the full network →
Location
- Address
- 1 Quality Dr
- City
- Vacaville
- State
- California
- ZIP
- 95688
- Coordinates
- 38.38874, -121.93800
Within ~15 km
Nearby charging
- SCIF - Vacaville30 ports
AmpUp · Available
- Lawler Ranch - Suisun City30 ports
EVCS · Available
Tesla Supercharger · Available
- Fairfield Transit Center Garage21 ports
EVCS · Available
Noodoe · Planned
Tesla Supercharger · Available
What kind of charging does Vacaville MOB offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vacaville MOB compare with other stations in Vacaville?
Vacaville has 51 charging stations in the DOE registry with 206 ports. Vacaville MOB accounts for under 1% of the charging ports in Vacaville. Electrify America runs 2 stations in Vacaville. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Vacaville MOB?
The Volkswagen-founded DC fast network along highway corridors. Electrify America operates 1,221 stations in the registry across 48 states, with 6,029 DC fast and 170 Level 2 ports in total. 330 of those stations are in California, 2% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 30, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vacaville MOB have?
Vacaville MOB has 2 charging ports: 2 Level 2.
Does Vacaville MOB have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Vacaville MOB have?
Vacaville MOB has J1772 connectors.
Is Vacaville MOB open to the public?
Yes. Vacaville MOB is listed with public access, and its status is available.
Where is Vacaville MOB?
Vacaville MOB is at 1 Quality Dr, Vacaville, CA 95688. Its coordinates are 38.38874, -121.93800.
More EV charging around Vacaville
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458470, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vacaville MOB, Vacaville, CA (AFDC station 458470)”, https://chargecensus.com/stations/california/vacaville-mob-458470 (data as of October 12, 2026).