ChargeCensus

US Bank Soledad

Available

EV charging station in Soledad, California on the EVCS network — 1 DC fast. US DOE AFDC station 348786.

At a glance

US Bank Soledad is a public EV charging station at 695 Front St in Soledad, California, on the EVCS network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 1, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID348786
NetworkEVCS
StatusAvailable (E)
AccessPublic
Open dateSep 1, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVCS

Operates 277 stations in the DOE registry — view the full network →

Location

Address
695 Front St
City
Soledad
ZIP
93960
Coordinates
36.42597, -121.32713

Within ~15 km

Nearby charging

What kind of charging does US Bank Soledad offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does US Bank Soledad compare with other stations in Soledad?

Soledad has 6 charging stations in the DOE registry with 30 ports. US Bank Soledad accounts for 3% of the charging ports in Soledad. It is the only EVCS station in Soledad. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates US Bank Soledad?

EVCS operates 277 stations in the registry across 3 states, with 890 DC fast and 705 Level 2 ports in total. 200 of those stations are in California, under 1% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 1, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does US Bank Soledad have?

US Bank Soledad has 1 charging port: 1 DC fast.

Does US Bank Soledad have DC fast charging?

Yes. The registry lists 1 DC fast port at US Bank Soledad, with CHAdeMO and CCS connectors.

What connectors does US Bank Soledad have?

US Bank Soledad has CHAdeMO and CCS connectors.

Is US Bank Soledad open to the public?

Yes. US Bank Soledad is listed with public access, and its status is available.

Where is US Bank Soledad?

US Bank Soledad is at 695 Front St, Soledad, CA 93960. Its coordinates are 36.42597, -121.32713.

More EV charging around Soledad

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 348786, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “US Bank Soledad, Soledad, CA (AFDC station 348786)”, https://chargecensus.com/stations/california/us-bank-soledad-348786 (data as of October 12, 2026).