University Square
AvailableEV charging station in San Diego, California on the EVgo network — 8 DC fast. US DOE AFDC station 448438.
At a glance
University Square is a public EV charging station at 5931 University Ave in San Diego, California, on the EVgo network. It has 8 charging ports (8 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Dec 31, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 448438 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 31, 2025 |
| Last updated at source | Oct 11, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5931 University Ave
- City
- San Diego
- State
- California
- ZIP
- 92115
- Coordinates
- 32.74982, -117.06999
Within ~15 km
Nearby charging
- Chula Vista Ca Sdc108 ports
Non-networked · Available
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
Tesla Supercharger · Available
- WallyPark Airport Parking30 ports
Non-networked · Available
What kind of charging does University Square offer?
Of its 8 ports, 8 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about twice the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does University Square compare with other stations in San Diego?
San Diego has 1,037 charging stations in the DOE registry with 3,682 ports, the 2nd-most of 812 cities and towns in California. University Square accounts for under 1% of the charging ports in San Diego. EVgo runs 15 stations in San Diego. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates University Square?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 31, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 11, 2026.
Frequently asked questions
How many chargers does University Square have?
University Square has 8 charging ports: 8 DC fast.
Does University Square have DC fast charging?
Yes. The registry lists 8 DC fast ports at University Square, with CCS connectors.
What connectors does University Square have?
University Square has CCS connectors.
Is University Square open to the public?
Yes. University Square is listed with public access, and its status is available.
Where is University Square?
University Square is at 5931 University Ave, San Diego, CA 92115. Its coordinates are 32.74982, -117.06999.
More EV charging around San Diego
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 448438, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “University Square, San Diego, CA (AFDC station 448438)”, https://chargecensus.com/stations/california/university-square-448438 (data as of October 12, 2026).