The Boeing Co Els S49 Main
AvailableEV charging station in El Segundo, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 274587.
At a glance
The Boeing Co Els S49 Main is a public EV charging station at 2051 E Maple Ave in El Segundo, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 22, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 274587 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 22, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2051 E Maple Ave
- City
- El Segundo
- State
- California
- ZIP
- 90245
- Coordinates
- 33.92831, -118.38968
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
Non-networked · Available
Tesla Destination · Available
- Century Park Parking SW & NW79 ports
AmpUp · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
EVCS · Available
What kind of charging does The Boeing Co Els S49 Main offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Boeing Co Els S49 Main compare with other stations in El Segundo?
El Segundo has 68 charging stations in the DOE registry with 213 ports. The Boeing Co Els S49 Main accounts for under 1% of the charging ports in El Segundo. ChargePoint runs 48 stations in El Segundo. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates The Boeing Co Els S49 Main?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 22, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Boeing Co Els S49 Main have?
The Boeing Co Els S49 Main has 2 charging ports: 2 Level 2.
Does The Boeing Co Els S49 Main have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Boeing Co Els S49 Main have?
The Boeing Co Els S49 Main has J1772 connectors.
Is The Boeing Co Els S49 Main open to the public?
Yes. The Boeing Co Els S49 Main is listed with public access, and its status is available.
Where is The Boeing Co Els S49 Main?
The Boeing Co Els S49 Main is at 2051 E Maple Ave, El Segundo, CA 90245. Its coordinates are 33.92831, -118.38968.
More EV charging around El Segundo
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 274587, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Boeing Co Els S49 Main, El Segundo, CA (AFDC station 274587)”, https://chargecensus.com/stations/california/the-boeing-co-els-s49-main-274587 (data as of October 12, 2026).