Terapropllc Davis Chipotle2
AvailableEV charging station in Davis, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 466489.
At a glance
Terapropllc Davis Chipotle2 is a public EV charging station at 4823 Chiles Road in Davis, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 21, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 466489 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 21, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4823 Chiles Road
- City
- Davis
- State
- California
- ZIP
- 95618
- Coordinates
- 38.55141, -121.69393
Within ~15 km
Nearby charging
- WattEV - Sacramento108 ports
Watt EV · Planned
Tesla Supercharger · Available
Non-networked · Available
- Davis, CA - Tesla Supercharger16 ports
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
What kind of charging does Terapropllc Davis Chipotle2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Terapropllc Davis Chipotle2 compare with other stations in Davis?
Davis has 50 charging stations in the DOE registry with 192 ports. Terapropllc Davis Chipotle2 accounts for 1% of the charging ports in Davis. ChargePoint runs 20 stations in Davis. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Terapropllc Davis Chipotle2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 21, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Terapropllc Davis Chipotle2 have?
Terapropllc Davis Chipotle2 has 2 charging ports: 2 Level 2.
Does Terapropllc Davis Chipotle2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Terapropllc Davis Chipotle2 have?
Terapropllc Davis Chipotle2 has J1772 connectors.
Is Terapropllc Davis Chipotle2 open to the public?
Yes. Terapropllc Davis Chipotle2 is listed with public access, and its status is available.
Where is Terapropllc Davis Chipotle2?
Terapropllc Davis Chipotle2 is at 4823 Chiles Road, Davis, CA 95618. Its coordinates are 38.55141, -121.69393.
More EV charging around Davis
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 466489, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Terapropllc Davis Chipotle2, Davis, CA (AFDC station 466489)”, https://chargecensus.com/stations/california/terapropllc-davis-chipotle2-466489 (data as of October 12, 2026).