Target Parking Lot 1
AvailableEV charging station in Lodi, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 165047.
At a glance
Target Parking Lot 1 is a public EV charging station at 2355 W Kettlement Ln in Lodi, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 1, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 165047 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Jul 1, 2020 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 2355 W Kettlement Ln
- City
- Lodi
- State
- California
- ZIP
- 95242
- Coordinates
- 38.11702, -121.30294
Within ~15 km
Nearby charging
Blink · Available
- College Square18 ports
ViaLynk · Available
- Thornton Plaza18 ports
Evolv Charging · Available
- Morada Crossings15 ports
Blink · Available
- Grand Canal - Stockton14 ports
EVCS · Available
EVCS · Available
What kind of charging does Target Parking Lot 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a parking lot location.
How does Target Parking Lot 1 compare with other stations in Lodi?
Lodi has 25 charging stations in the DOE registry with 45 ports. Target Parking Lot 1 accounts for 4% of the charging ports in Lodi. ChargePoint runs 23 stations in Lodi. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Target Parking Lot 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 1, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Target Parking Lot 1 have?
Target Parking Lot 1 has 2 charging ports: 2 Level 2.
Does Target Parking Lot 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Target Parking Lot 1 have?
Target Parking Lot 1 has J1772 connectors.
Is charging at Target Parking Lot 1 free?
Pricing as reported to the DOE registry: Free.
Is Target Parking Lot 1 open to the public?
Yes. Target Parking Lot 1 is listed with public access, and its status is available.
Where is Target Parking Lot 1?
Target Parking Lot 1 is at 2355 W Kettlement Ln, Lodi, CA 95242. Its coordinates are 38.11702, -121.30294.
More EV charging around Lodi
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 165047, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Target Parking Lot 1, Lodi, CA (AFDC station 165047)”, https://chargecensus.com/stations/california/target-parking-lot-1-165047 (data as of October 12, 2026).