ChargeCensus

Target Murrieta #T2499

Available

EV charging station in Murrieta, California on the EVgo network — 10 DC fast. US DOE AFDC station 373139.

At a glance

Target Murrieta #T2499 is a public EV charging station at 27818 Clinton Keith Rd in Murrieta, California, on the EVgo network. It has 10 charging ports (10 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Dec 14, 2024.

Total ports
10
DC fast
10
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID373139
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateDec 14, 2024
Last updated at sourceOct 11, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
27818 Clinton Keith Rd
ZIP
92562
Coordinates
33.60480, -117.17432

Within ~15 km

Nearby charging

What kind of charging does Target Murrieta #T2499 offer?

Of its 10 ports, 10 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.7 times the California average of 3.7 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.

How does Target Murrieta #T2499 compare with other stations in Murrieta?

Murrieta has 39 charging stations in the DOE registry with 133 ports. Target Murrieta #T2499 accounts for 8% of the charging ports in Murrieta. It is the only EVgo station in Murrieta. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Target Murrieta #T2499?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 14, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 11, 2026.

Frequently asked questions

How many chargers does Target Murrieta #T2499 have?

Target Murrieta #T2499 has 10 charging ports: 10 DC fast.

Does Target Murrieta #T2499 have DC fast charging?

Yes. The registry lists 10 DC fast ports at Target Murrieta #T2499, with CCS and NACS (Tesla) connectors.

What connectors does Target Murrieta #T2499 have?

Target Murrieta #T2499 has CCS and NACS (Tesla) connectors.

Is Target Murrieta #T2499 open to the public?

Yes. Target Murrieta #T2499 is listed with public access, and its status is available.

Where is Target Murrieta #T2499?

Target Murrieta #T2499 is at 27818 Clinton Keith Rd, Murrieta, CA 92562. Its coordinates are 33.60480, -117.17432.

More EV charging around Murrieta

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 373139, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Target Murrieta #T2499, Murrieta, CA (AFDC station 373139)”, https://chargecensus.com/stations/california/target-murrieta-t2499-373139 (data as of October 12, 2026).