Studio 4250-Station 01
AvailableEV charging station in Universal City, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 178456.
At a glance
Studio 4250-Station 01 is a public EV charging station at 515-699 James Stewart Ave in Universal City, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 178456 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 515-699 James Stewart Ave
- City
- Universal City
- State
- California
- ZIP
- 91602
- Coordinates
- 34.14158, -118.35324
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
- G3120 ports
Blink · Available
Non-networked · Available
- G294 ports
Blink · Available
- LADWP - Valley Center Admin Lot90 ports
Non-networked · Available
Tesla Destination · Available
What kind of charging does Studio 4250-Station 01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Studio 4250-Station 01 compare with other stations in Universal City?
Universal City has 62 charging stations in the DOE registry with 157 ports. Studio 4250-Station 01 accounts for 1% of the charging ports in Universal City. ChargePoint runs 56 stations in Universal City. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Studio 4250-Station 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Studio 4250-Station 01 have?
Studio 4250-Station 01 has 2 charging ports: 2 Level 2.
Does Studio 4250-Station 01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Studio 4250-Station 01 have?
Studio 4250-Station 01 has J1772 connectors.
Is Studio 4250-Station 01 open to the public?
Yes. Studio 4250-Station 01 is listed with public access, and its status is available.
Where is Studio 4250-Station 01?
Studio 4250-Station 01 is at 515-699 James Stewart Ave, Universal City, CA 91602. Its coordinates are 34.14158, -118.35324.
More EV charging around Universal City
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 178456, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Studio 4250-Station 01, Universal City, CA (AFDC station 178456)”, https://chargecensus.com/stations/california/studio-4250-station-01-178456 (data as of October 12, 2026).