Stone Pine Cove West Spc
AvailableEV charging station in Half Moon Bay, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 429820.
At a glance
Stone Pine Cove West Spc is a public EV charging station at 880 Stone Pine Rd in Half Moon Bay, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 14, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 429820 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 14, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 880 Stone Pine Rd
- City
- Half Moon Bay
- State
- California
- ZIP
- 94019
- Coordinates
- 37.46952, -122.42220
Within ~15 km
Nearby charging
- Milbrae Station40 ports
AmpUp · Available
Tesla Supercharger · Available
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Pf Ca Sm Ala20 ports
PowerFlex · Available
What kind of charging does Stone Pine Cove West Spc offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Stone Pine Cove West Spc compare with other stations in Half Moon Bay?
Half Moon Bay has 13 charging stations in the DOE registry with 38 ports. Stone Pine Cove West Spc accounts for 3% of the charging ports in Half Moon Bay. ChargePoint runs 7 stations in Half Moon Bay. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Stone Pine Cove West Spc?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 14, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stone Pine Cove West Spc have?
Stone Pine Cove West Spc has 1 charging port: 1 Level 2.
Does Stone Pine Cove West Spc have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Stone Pine Cove West Spc have?
Stone Pine Cove West Spc has J1772 connectors.
Is Stone Pine Cove West Spc open to the public?
Yes. Stone Pine Cove West Spc is listed with public access, and its status is available.
Where is Stone Pine Cove West Spc?
Stone Pine Cove West Spc is at 880 Stone Pine Rd, Half Moon Bay, CA 94019. Its coordinates are 37.46952, -122.42220.
More EV charging around Half Moon Bay
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 429820, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stone Pine Cove West Spc, Half Moon Bay, CA (AFDC station 429820)”, https://chargecensus.com/stations/california/stone-pine-cove-west-spc-429820 (data as of October 12, 2026).