Sjvapcd Fresno 2
AvailableEV charging station in Fresno, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 233454.
At a glance
Sjvapcd Fresno 2 is a public EV charging station at 1990 E Gettysburg Ave in Fresno, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 14, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 233454 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 14, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1990 E Gettysburg Ave
- City
- Fresno
- State
- California
- ZIP
- 93726
- Coordinates
- 36.80064, -119.78664
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
- Arco Plaza - Tesla Supercharger16 ports
Tesla Supercharger · Available
- Petroleum Property Holdings LLC16 ports
Evolv Charging · Planned
Tesla Supercharger · Available
What kind of charging does Sjvapcd Fresno 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Sjvapcd Fresno 2 compare with other stations in Fresno?
Fresno has 202 charging stations in the DOE registry with 618 ports, the 18th-most of 812 cities and towns in California. Sjvapcd Fresno 2 accounts for under 1% of the charging ports in Fresno. ChargePoint runs 139 stations in Fresno. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Sjvapcd Fresno 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 14, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sjvapcd Fresno 2 have?
Sjvapcd Fresno 2 has 2 charging ports: 2 Level 2.
Does Sjvapcd Fresno 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Sjvapcd Fresno 2 have?
Sjvapcd Fresno 2 has J1772 connectors.
Is Sjvapcd Fresno 2 open to the public?
Yes. Sjvapcd Fresno 2 is listed with public access, and its status is available.
Where is Sjvapcd Fresno 2?
Sjvapcd Fresno 2 is at 1990 E Gettysburg Ave, Fresno, CA 93726. Its coordinates are 36.80064, -119.78664.
More EV charging around Fresno
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 233454, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sjvapcd Fresno 2, Fresno, CA (AFDC station 233454)”, https://chargecensus.com/stations/california/sjvapcd-fresno-2-233454 (data as of October 12, 2026).