ChargeCensus

Shops at La Jolla Village

Available

EV charging station in La Jolla, California on the EVgo network — 6 DC fast. US DOE AFDC station 416945.

At a glance

Shops at La Jolla Village is a public EV charging station at 8849 Villa La Jolla Dr. in La Jolla, California, on the EVgo network. It has 6 charging ports (6 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 25, 2025.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID416945
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateJul 25, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
8849 Villa La Jolla Dr.
ZIP
92037
Coordinates
32.86965, -117.23178

Within ~15 km

Nearby charging

What kind of charging does Shops at La Jolla Village offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% above the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Shops at La Jolla Village compare with other stations in La Jolla?

La Jolla has 54 charging stations in the DOE registry with 297 ports. Shops at La Jolla Village accounts for 2% of the charging ports in La Jolla. EVgo runs 2 stations in La Jolla. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Shops at La Jolla Village?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 25, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Shops at La Jolla Village have?

Shops at La Jolla Village has 6 charging ports: 6 DC fast.

Does Shops at La Jolla Village have DC fast charging?

Yes. The registry lists 6 DC fast ports at Shops at La Jolla Village, with CHAdeMO and CCS connectors.

What connectors does Shops at La Jolla Village have?

Shops at La Jolla Village has CHAdeMO and CCS connectors.

Is Shops at La Jolla Village open to the public?

Yes. Shops at La Jolla Village is listed with public access, and its status is available.

Where is Shops at La Jolla Village?

Shops at La Jolla Village is at 8849 Villa La Jolla Dr., La Jolla, CA 92037. Its coordinates are 32.86965, -117.23178.

More EV charging around La Jolla

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 416945, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Shops at La Jolla Village, La Jolla, CA (AFDC station 416945)”, https://chargecensus.com/stations/california/shops-at-la-jolla-village-416945 (data as of October 12, 2026).