ChargeCensus

Sherman Circle Gault 3&4

Available

EV charging station in Los Angeles, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 310598.

At a glance

Sherman Circle Gault 3&4 is a public EV charging station at 14645 Gault St in Los Angeles, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 14, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310598
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 14, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
14645 Gault St
ZIP
91405
Coordinates
34.19980, -118.45246

Within ~15 km

Nearby charging

What kind of charging does Sherman Circle Gault 3&4 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Sherman Circle Gault 3&4 compare with other stations in Los Angeles?

Los Angeles has 2,123 charging stations in the DOE registry with 10,316 ports, the most of 812 cities and towns in California. Sherman Circle Gault 3&4 accounts for under 1% of the charging ports in Los Angeles. ChargePoint runs 1,026 stations in Los Angeles. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Sherman Circle Gault 3&4?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 14, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Sherman Circle Gault 3&4 have?

Sherman Circle Gault 3&4 has 2 charging ports: 2 Level 2.

Does Sherman Circle Gault 3&4 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Sherman Circle Gault 3&4 have?

Sherman Circle Gault 3&4 has J1772 connectors.

Is Sherman Circle Gault 3&4 open to the public?

Yes. Sherman Circle Gault 3&4 is listed with public access, and its status is available.

Where is Sherman Circle Gault 3&4?

Sherman Circle Gault 3&4 is at 14645 Gault St, Los Angeles, CA 91405. Its coordinates are 34.19980, -118.45246.

More EV charging around Los Angeles

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310598, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sherman Circle Gault 3&4, Los Angeles, CA (AFDC station 310598)”, https://chargecensus.com/stations/california/sherman-circle-gault-3-4-310598 (data as of October 12, 2026).