ChargeCensus

SemaConnect Bangalore Production facility

Temporarily unavailable

EV charging station in Bowie, California on the Blink network — 7 DC fast · 4 Level 2. US DOE AFDC station 310122.

At a glance

SemaConnect Bangalore Production facility is a public EV charging station at #123, Block 4, 50 Feet Road, Indira Nagar in Bowie, California, on the Blink network. It has 11 charging ports (7 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Apr 26, 2023.

Total ports
11
DC fast
7
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310122
NetworkBlink
StatusTemporarily unavailable (T)
AccessPublic
Open dateApr 26, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
#123, Block 4, 50 Feet Road, Indira Nagar
City
Bowie
ZIP
92111
Coordinates
36.77826, -119.41793

Within ~15 km

Nearby charging

What kind of charging does SemaConnect Bangalore Production facility offer?

Of its 11 ports, 7 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.9 times the California average of 3.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does SemaConnect Bangalore Production facility compare with other stations in Bowie?

Bowie has 1 charging station in the DOE registry with 11 ports. It is the only Blink station in Bowie. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates SemaConnect Bangalore Production facility?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 643 of those stations are in California, 3% of the state's 21,814.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 26, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does SemaConnect Bangalore Production facility have?

SemaConnect Bangalore Production facility has 11 charging ports: 7 DC fast · 4 Level 2.

Does SemaConnect Bangalore Production facility have DC fast charging?

Yes. The registry lists 7 DC fast ports at SemaConnect Bangalore Production facility, with CCS connectors.

What connectors does SemaConnect Bangalore Production facility have?

SemaConnect Bangalore Production facility has J1772 and CCS connectors.

Is SemaConnect Bangalore Production facility open to the public?

Yes. SemaConnect Bangalore Production facility is listed with public access, and its status is temporarily unavailable.

Where is SemaConnect Bangalore Production facility?

SemaConnect Bangalore Production facility is at #123, Block 4, 50 Feet Road, Indira Nagar, Bowie, CA 92111. Its coordinates are 36.77826, -119.41793.

More EV charging around Bowie

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310122, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “SemaConnect Bangalore Production facility, Bowie, CA (AFDC station 310122)”, https://chargecensus.com/stations/california/semaconnect-bangalore-production-facility-310122 (data as of October 12, 2026).