SemaConnect Bangalore Production facility
Temporarily unavailableEV charging station in Bowie, California on the Blink network — 7 DC fast · 4 Level 2. US DOE AFDC station 310122.
At a glance
SemaConnect Bangalore Production facility is a public EV charging station at #123, Block 4, 50 Feet Road, Indira Nagar in Bowie, California, on the Blink network. It has 11 charging ports (7 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Apr 26, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 310122 |
| Network | Blink |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Apr 26, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- #123, Block 4, 50 Feet Road, Indira Nagar
- City
- Bowie
- State
- California
- ZIP
- 92111
- Coordinates
- 36.77826, -119.41793
Within ~15 km
Nearby charging
- City of Sanger - City Hall6 ports
Blink · Available
- ELion - Sanger School Bus2 ports
EV Connect · Temporarily unavailable
- FCRTA - Sanger2 ports
Electrify America · Available
- City of Sanger - City Hall2 ports
Non-networked · Available
- Blink Charging-Tempe 31 ports
Blink · Temporarily unavailable
- Blink IQ Location Noida New1 ports
Blink · Temporarily unavailable
What kind of charging does SemaConnect Bangalore Production facility offer?
Of its 11 ports, 7 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.9 times the California average of 3.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does SemaConnect Bangalore Production facility compare with other stations in Bowie?
Bowie has 1 charging station in the DOE registry with 11 ports. It is the only Blink station in Bowie. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates SemaConnect Bangalore Production facility?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 643 of those stations are in California, 3% of the state's 21,814.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 26, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does SemaConnect Bangalore Production facility have?
SemaConnect Bangalore Production facility has 11 charging ports: 7 DC fast · 4 Level 2.
Does SemaConnect Bangalore Production facility have DC fast charging?
Yes. The registry lists 7 DC fast ports at SemaConnect Bangalore Production facility, with CCS connectors.
What connectors does SemaConnect Bangalore Production facility have?
SemaConnect Bangalore Production facility has J1772 and CCS connectors.
Is SemaConnect Bangalore Production facility open to the public?
Yes. SemaConnect Bangalore Production facility is listed with public access, and its status is temporarily unavailable.
Where is SemaConnect Bangalore Production facility?
SemaConnect Bangalore Production facility is at #123, Block 4, 50 Feet Road, Indira Nagar, Bowie, CA 92111. Its coordinates are 36.77826, -119.41793.
More EV charging around Bowie
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 310122, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “SemaConnect Bangalore Production facility, Bowie, CA (AFDC station 310122)”, https://chargecensus.com/stations/california/semaconnect-bangalore-production-facility-310122 (data as of October 12, 2026).