Sdsu P7
Temporarily unavailableEV charging station in San Diego, California on the Dirt Road network — 6 Level 2. US DOE AFDC station 440852.
At a glance
Sdsu P7 is a public EV charging station at 55th St, in San Diego, California, on the Dirt Road network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Mar 18, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 440852 |
| Network | Dirt Road |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Mar 18, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 55th St,
- City
- San Diego
- State
- California
- ZIP
- 92115
- Coordinates
- 32.77250, -117.07657
Within ~15 km
Nearby charging
- Chula Vista Ca Sdc108 ports
Non-networked · Available
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
Tesla Supercharger · Available
- UCSD - Athena39 ports
PowerFlex · Available
What kind of charging does Sdsu P7 offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 60% above the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Sdsu P7 compare with other stations in San Diego?
San Diego has 1,037 charging stations in the DOE registry with 3,682 ports, the 2nd-most of 812 cities and towns in California. Sdsu P7 accounts for under 1% of the charging ports in San Diego. Dirt Road runs 12 stations in San Diego. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Sdsu P7?
Dirt Road operates 51 stations in the registry across 6 states, with 55 DC fast and 224 Level 2 ports in total. 17 of those stations are in California, under 1% of the state's 21,814.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sdsu P7 have?
Sdsu P7 has 6 charging ports: 6 Level 2.
Does Sdsu P7 have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does Sdsu P7 have?
Sdsu P7 has J1772 connectors.
Is Sdsu P7 open to the public?
Yes. Sdsu P7 is listed with public access, and its status is temporarily unavailable.
Where is Sdsu P7?
Sdsu P7 is at 55th St,, San Diego, CA 92115. Its coordinates are 32.77250, -117.07657.
More EV charging around San Diego
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 440852, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sdsu P7, San Diego, CA (AFDC station 440852)”, https://chargecensus.com/stations/california/sdsu-p7-440852 (data as of October 12, 2026).