Sbcusd Ramos_3and4
AvailableEV charging station in San Bernardino, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 469550.
At a glance
Sbcusd Ramos_3and4 is a public EV charging station at 701 N E St in San Bernardino, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 469550 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 15, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 701 N E St
- City
- San Bernardino
- State
- California
- ZIP
- 92410
- Coordinates
- 34.11214, -117.29384
Within ~15 km
Nearby charging
- United Parcel Service100 ports
Non-networked · Available
- Siena Apartments80 ports
Loop · Available
- Greenlane Charging Center41 ports
Non-networked · Available
- Sage Apartments40 ports
Loop · Available
- Skypark Santa Village39 ports
evGateway · Available
- Meridian Terrace32 ports
Loop · Available
What kind of charging does Sbcusd Ramos_3and4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Sbcusd Ramos_3and4 compare with other stations in San Bernardino?
San Bernardino has 165 charging stations in the DOE registry with 652 ports, the 21st-most of 812 cities and towns in California. Sbcusd Ramos_3and4 accounts for under 1% of the charging ports in San Bernardino. ChargePoint runs 142 stations in San Bernardino. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Sbcusd Ramos_3and4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sbcusd Ramos_3and4 have?
Sbcusd Ramos_3and4 has 2 charging ports: 2 Level 2.
Does Sbcusd Ramos_3and4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Sbcusd Ramos_3and4 have?
Sbcusd Ramos_3and4 has J1772 connectors.
Is Sbcusd Ramos_3and4 open to the public?
Yes. Sbcusd Ramos_3and4 is listed with public access, and its status is available.
Where is Sbcusd Ramos_3and4?
Sbcusd Ramos_3and4 is at 701 N E St, San Bernardino, CA 92410. Its coordinates are 34.11214, -117.29384.
More EV charging around San Bernardino
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 469550, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sbcusd Ramos_3and4, San Bernardino, CA (AFDC station 469550)”, https://chargecensus.com/stations/california/sbcusd-ramos-3and4-469550 (data as of October 12, 2026).