Sbcs Sbcs 3
AvailableEV charging station in Chula Vista, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 421090.
At a glance
Sbcs Sbcs 3 is a public EV charging station at 318 4th Avenue in Chula Vista, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 28, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 421090 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 28, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 318 4th Avenue
- City
- Chula Vista
- State
- California
- ZIP
- 91910
- Coordinates
- 32.63949, -117.08407
Within ~15 km
Nearby charging
- Chula Vista Ca Sdc108 ports
Non-networked · Available
Tesla Supercharger · Available
Non-networked · Available
Non-networked · Available
Tesla Supercharger · Available
- UCSD - First Avenue30 ports
PowerFlex · Available
What kind of charging does Sbcs Sbcs 3 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Sbcs Sbcs 3 compare with other stations in Chula Vista?
Chula Vista has 80 charging stations in the DOE registry with 404 ports. Sbcs Sbcs 3 accounts for under 1% of the charging ports in Chula Vista. ChargePoint runs 43 stations in Chula Vista. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Sbcs Sbcs 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 28, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sbcs Sbcs 3 have?
Sbcs Sbcs 3 has 1 charging port: 1 Level 2.
Does Sbcs Sbcs 3 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Sbcs Sbcs 3 have?
Sbcs Sbcs 3 has J1772 connectors.
Is Sbcs Sbcs 3 open to the public?
Yes. Sbcs Sbcs 3 is listed with public access, and its status is available.
Where is Sbcs Sbcs 3?
Sbcs Sbcs 3 is at 318 4th Avenue, Chula Vista, CA 91910. Its coordinates are 32.63949, -117.08407.
More EV charging around Chula Vista
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 421090, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sbcs Sbcs 3, Chula Vista, CA (AFDC station 421090)”, https://chargecensus.com/stations/california/sbcs-sbcs-3-421090 (data as of October 12, 2026).