ChargeCensus

Santa Clara Charger 2

Available

EV charging station in Santa Clara, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 446967.

At a glance

Santa Clara Charger 2 is a public EV charging station at Great America Parkway 5001 great America park in Santa Clara, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 7, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID446967
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 7, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
Great America Parkway 5001 great America park
ZIP
95054
Coordinates
37.40544, -121.97441

Within ~15 km

Nearby charging

What kind of charging does Santa Clara Charger 2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Santa Clara Charger 2 compare with other stations in Santa Clara?

Santa Clara has 402 charging stations in the DOE registry with 1,037 ports, the 7th-most of 812 cities and towns in California. Santa Clara Charger 2 accounts for under 1% of the charging ports in Santa Clara. ChargePoint runs 372 stations in Santa Clara. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Santa Clara Charger 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 7, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Santa Clara Charger 2 have?

Santa Clara Charger 2 has 1 charging port: 1 Level 2.

Does Santa Clara Charger 2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Santa Clara Charger 2 have?

Santa Clara Charger 2 has J1772 connectors.

Is Santa Clara Charger 2 open to the public?

Yes. Santa Clara Charger 2 is listed with public access, and its status is available.

Where is Santa Clara Charger 2?

Santa Clara Charger 2 is at Great America Parkway 5001 great America park, Santa Clara, CA 95054. Its coordinates are 37.40544, -121.97441.

More EV charging around Santa Clara

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 446967, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Santa Clara Charger 2, Santa Clara, CA (AFDC station 446967)”, https://chargecensus.com/stations/california/santa-clara-charger-2-446967 (data as of October 12, 2026).