Santa Barbara Eastside Library
AvailableEV charging station in Santa Barbara, California on the Dirt Road network — 2 DC fast. US DOE AFDC station 462546.
At a glance
Santa Barbara Eastside Library is a public EV charging station at 1102 E Montecito St in Santa Barbara, California, on the Dirt Road network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jul 1, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 462546 |
| Network | Dirt Road |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 1, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1102 E Montecito St
- City
- Santa Barbara
- State
- California
- ZIP
- 93103
- Coordinates
- 34.42613, -119.67976
Within ~15 km
Nearby charging
Electrify America · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
PowerFlex · Available
- Goleta Water District10 ports
Turnongreen · Available
PowerFlex · Available
What kind of charging does Santa Barbara Eastside Library offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Santa Barbara Eastside Library compare with other stations in Santa Barbara?
Santa Barbara has 112 charging stations in the DOE registry with 326 ports. Santa Barbara Eastside Library accounts for under 1% of the charging ports in Santa Barbara. It is the only Dirt Road station in Santa Barbara. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Santa Barbara Eastside Library?
Dirt Road operates 51 stations in the registry across 6 states, with 55 DC fast and 224 Level 2 ports in total. 17 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 1, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Santa Barbara Eastside Library have?
Santa Barbara Eastside Library has 2 charging ports: 2 DC fast.
Does Santa Barbara Eastside Library have DC fast charging?
Yes. The registry lists 2 DC fast ports at Santa Barbara Eastside Library, with CCS connectors.
What connectors does Santa Barbara Eastside Library have?
Santa Barbara Eastside Library has CCS connectors.
Is Santa Barbara Eastside Library open to the public?
Yes. Santa Barbara Eastside Library is listed with public access, and its status is available.
Where is Santa Barbara Eastside Library?
Santa Barbara Eastside Library is at 1102 E Montecito St, Santa Barbara, CA 93103. Its coordinates are 34.42613, -119.67976.
More EV charging around Santa Barbara
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 462546, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Santa Barbara Eastside Library, Santa Barbara, CA (AFDC station 462546)”, https://chargecensus.com/stations/california/santa-barbara-eastside-library-462546 (data as of October 12, 2026).