San Mateo Garage L2 1
AvailableEV charging station in San Mateo, California on the PowerFlex network — 12 Level 2. US DOE AFDC station 331409.
At a glance
San Mateo Garage L2 1 is a public EV charging station at 8 2nd Ave in San Mateo, California, on the PowerFlex network. It has 12 charging ports (12 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 21, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 331409 |
| Network | PowerFlex |
| Status | Available (E) |
| Access | Public |
| Facility | Parking garage |
| Open date | Mar 21, 2024 |
| Last updated at source | Jun 17, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.26 per kWh
Location
- Address
- 8 2nd Ave
- City
- San Mateo
- State
- California
- ZIP
- 94401
- Coordinates
- 37.56370, -122.32640
Within ~15 km
Nearby charging
- Google102 ports
ChargePoint · Available
- Volkswagen Group of America51 ports
PowerFlex · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Milbrae Station40 ports
AmpUp · Available
Tesla Destination · Available
What kind of charging does San Mateo Garage L2 1 offer?
Of its 12 ports, 12 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.2 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.26 per kWh”. The site is listed as a parking garage location.
How does San Mateo Garage L2 1 compare with other stations in San Mateo?
San Mateo has 286 charging stations in the DOE registry with 775 ports, the 9th-most of 812 cities and towns in California. San Mateo Garage L2 1 accounts for 2% of the charging ports in San Mateo. PowerFlex runs 3 stations in San Mateo. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates San Mateo Garage L2 1?
PowerFlex operates 253 stations in the registry across 6 states, with 145 DC fast and 4,527 Level 2 ports in total. 242 of those stations are in California, 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 21, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Jun 17, 2026.
Frequently asked questions
How many chargers does San Mateo Garage L2 1 have?
San Mateo Garage L2 1 has 12 charging ports: 12 Level 2.
Does San Mateo Garage L2 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 12 ports are all Level 2.
What connectors does San Mateo Garage L2 1 have?
San Mateo Garage L2 1 has J1772 connectors.
Is charging at San Mateo Garage L2 1 free?
Pricing as reported to the DOE registry: $0.26 per kWh.
Is San Mateo Garage L2 1 open to the public?
Yes. San Mateo Garage L2 1 is listed with public access, and its status is available.
Where is San Mateo Garage L2 1?
San Mateo Garage L2 1 is at 8 2nd Ave, San Mateo, CA 94401. Its coordinates are 37.56370, -122.32640.
More EV charging around San Mateo
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 331409, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “San Mateo Garage L2 1, San Mateo, CA (AFDC station 331409)”, https://chargecensus.com/stations/california/san-mateo-garage-l2-1-331409 (data as of October 12, 2026).