San Marco Apts Ev3 Ev4
AvailableEV charging station in Walnut Creek, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 349481.
At a glance
San Marco Apts Ev3 Ev4 is a public EV charging station at 1301 Montego in Walnut Creek, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 27, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 349481 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 27, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1301 Montego
- City
- Walnut Creek
- State
- California
- ZIP
- 94598
- Coordinates
- 37.90878, -122.04746
Within ~15 km
Nearby charging
- Bishop Ranch66 ports
EV Connect · Available
- Bishop Ranch39 ports
EV Connect · Available
- Bishop Ranch 129 ports
EV Connect · Available
- Bishop Ranch29 ports
EV Connect · Available
- Bishop Ranch 1525 ports
EV Connect · Available
Tesla Supercharger · Available
What kind of charging does San Marco Apts Ev3 Ev4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does San Marco Apts Ev3 Ev4 compare with other stations in Walnut Creek?
Walnut Creek has 77 charging stations in the DOE registry with 233 ports. San Marco Apts Ev3 Ev4 accounts for under 1% of the charging ports in Walnut Creek. ChargePoint runs 59 stations in Walnut Creek. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates San Marco Apts Ev3 Ev4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 27, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does San Marco Apts Ev3 Ev4 have?
San Marco Apts Ev3 Ev4 has 2 charging ports: 2 Level 2.
Does San Marco Apts Ev3 Ev4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does San Marco Apts Ev3 Ev4 have?
San Marco Apts Ev3 Ev4 has J1772 connectors.
Is San Marco Apts Ev3 Ev4 open to the public?
Yes. San Marco Apts Ev3 Ev4 is listed with public access, and its status is available.
Where is San Marco Apts Ev3 Ev4?
San Marco Apts Ev3 Ev4 is at 1301 Montego, Walnut Creek, CA 94598. Its coordinates are 37.90878, -122.04746.
More EV charging around Walnut Creek
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 349481, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “San Marco Apts Ev3 Ev4, Walnut Creek, CA (AFDC station 349481)”, https://chargecensus.com/stations/california/san-marco-apts-ev3-ev4-349481 (data as of October 12, 2026).