ChargeCensus

Safeway 0273 (Anderson, CA)

Available

EV charging station in Anderson, California on the Electrify America network — 4 DC fast. US DOE AFDC station 170354.

At a glance

Safeway 0273 (Anderson, CA) is a public EV charging station at 2601 Balls Ferry Road in Anderson, California, on the Electrify America network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Dec 18, 2020.

Total ports
4
DC fast
4
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID170354
NetworkElectrify America
StatusAvailable (E)
AccessPublic
Open dateDec 18, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Electrify America

Operates 1,221 stations in the DOE registry — view the full network →

Location

Address
2601 Balls Ferry Road
City
Anderson
ZIP
96007
Coordinates
40.45348, -122.28917

Within ~15 km

Nearby charging

What kind of charging does Safeway 0273 (Anderson, CA) offer?

Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is roughly in line with the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Safeway 0273 (Anderson, CA) compare with other stations in Anderson?

Anderson has 4 charging stations in the DOE registry with 15 ports. Safeway 0273 (Anderson, CA) accounts for 27% of the charging ports in Anderson. It is the only Electrify America station in Anderson. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Safeway 0273 (Anderson, CA)?

The Volkswagen-founded DC fast network along highway corridors. Electrify America operates 1,221 stations in the registry across 48 states, with 6,029 DC fast and 170 Level 2 ports in total. 330 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 18, 2020, one of 2,341 stations in California with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Safeway 0273 (Anderson, CA) have?

Safeway 0273 (Anderson, CA) has 4 charging ports: 4 DC fast.

Does Safeway 0273 (Anderson, CA) have DC fast charging?

Yes. The registry lists 4 DC fast ports at Safeway 0273 (Anderson, CA), with CCS connectors.

What connectors does Safeway 0273 (Anderson, CA) have?

Safeway 0273 (Anderson, CA) has CCS connectors.

Is Safeway 0273 (Anderson, CA) open to the public?

Yes. Safeway 0273 (Anderson, CA) is listed with public access, and its status is available.

Where is Safeway 0273 (Anderson, CA)?

Safeway 0273 (Anderson, CA) is at 2601 Balls Ferry Road, Anderson, CA 96007. Its coordinates are 40.45348, -122.28917.

More EV charging around Anderson

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 170354, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Safeway 0273 (Anderson, CA), Anderson, CA (AFDC station 170354)”, https://chargecensus.com/stations/california/safeway-0273-anderson-ca-170354 (data as of October 12, 2026).