Saddleback Lot 5b Dual
AvailableEV charging station in Mission Viejo, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 194930.
At a glance
Saddleback Lot 5b Dual is a public EV charging station at 28000 Marguerite Pkwy Lot 5B in Mission Viejo, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 2, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 194930 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 2, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 28000 Marguerite Pkwy Lot 5B
- City
- Mission Viejo
- State
- California
- ZIP
- 92692
- Coordinates
- 33.55094, -117.66384
Within ~15 km
Nearby charging
- Irvine Ca Sdc76 ports
Non-networked · Available
- Great Park Lot 570 ports
Noodoe · Available
- Great Park Lot 450 ports
Noodoe · Available
Tesla Supercharger · Available
- Great Park Lot 646 ports
Noodoe · Available
Tesla Supercharger · Available
What kind of charging does Saddleback Lot 5b Dual offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Saddleback Lot 5b Dual compare with other stations in Mission Viejo?
Mission Viejo has 55 charging stations in the DOE registry with 171 ports. Saddleback Lot 5b Dual accounts for 1% of the charging ports in Mission Viejo. ChargePoint runs 42 stations in Mission Viejo. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Saddleback Lot 5b Dual?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 2, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Saddleback Lot 5b Dual have?
Saddleback Lot 5b Dual has 2 charging ports: 2 Level 2.
Does Saddleback Lot 5b Dual have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Saddleback Lot 5b Dual have?
Saddleback Lot 5b Dual has J1772 connectors.
Is Saddleback Lot 5b Dual open to the public?
Yes. Saddleback Lot 5b Dual is listed with public access, and its status is available.
Where is Saddleback Lot 5b Dual?
Saddleback Lot 5b Dual is at 28000 Marguerite Pkwy Lot 5B, Mission Viejo, CA 92692. Its coordinates are 33.55094, -117.66384.
More EV charging around Mission Viejo
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 194930, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Saddleback Lot 5b Dual, Mission Viejo, CA (AFDC station 194930)”, https://chargecensus.com/stations/california/saddleback-lot-5b-dual-194930 (data as of October 12, 2026).