ChargeCensus

Riverside Public Library - Casa Blanca

Available

EV charging station in Riverside, California, not on a charging network — 1 Level 2. US DOE AFDC station 123923.

At a glance

Riverside Public Library - Casa Blanca is a public EV charging station at 2985 Madison St in Riverside, California, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2019.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID123923
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityLibrary
Open dateMay 1, 2019
Last updated at sourceJul 15, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
2985 Madison St
ZIP
92501
Coordinates
33.93076, -117.39993

Within ~15 km

Nearby charging

What kind of charging does Riverside Public Library - Casa Blanca offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a library location.

How does Riverside Public Library - Casa Blanca compare with other stations in Riverside?

Riverside has 132 charging stations in the DOE registry with 330 ports. Riverside Public Library - Casa Blanca accounts for under 1% of the charging ports in Riverside. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Riverside Public Library - Casa Blanca?

Riverside Public Library - Casa Blanca is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 1, 2019, one of 423 stations in California with a 2019 open date. The station's record was last updated at the source on Jul 15, 2026.

Frequently asked questions

How many chargers does Riverside Public Library - Casa Blanca have?

Riverside Public Library - Casa Blanca has 1 charging port: 1 Level 2.

Does Riverside Public Library - Casa Blanca have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Riverside Public Library - Casa Blanca have?

Riverside Public Library - Casa Blanca has J1772 connectors.

Is Riverside Public Library - Casa Blanca open to the public?

Yes. Riverside Public Library - Casa Blanca is listed with public access, and its status is available.

Where is Riverside Public Library - Casa Blanca?

Riverside Public Library - Casa Blanca is at 2985 Madison St, Riverside, CA 92501. Its coordinates are 33.93076, -117.39993.

More EV charging around Riverside

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 123923, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Riverside Public Library - Casa Blanca, Riverside, CA (AFDC station 123923)”, https://chargecensus.com/stations/california/riverside-public-library-casa-blanca-123923 (data as of October 12, 2026).