Riverfront Plaza
AvailableEV charging station in Sacramento, California on the Evolv Charging network — 10 Level 2. US DOE AFDC station 470336.
At a glance
Riverfront Plaza is a public EV charging station at 200 P St in Sacramento, California, on the Evolv Charging network. It has 10 charging ports (10 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 470336 |
| Network | Evolv Charging |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | Aug 16, 2024 |
| Last updated at source | Sep 23, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.30 per kWh
Location
- Address
- 200 P St
- City
- Sacramento
- State
- California
- ZIP
- 95814
- Coordinates
- 38.57602, -121.50601
Within ~15 km
Nearby charging
- WattEV - Sacramento108 ports
Watt EV · Planned
- CalPERS51 ports
Non-networked · Available
Non-networked · Available
Non-networked · Available
- Kaiser Permanente Point West32 ports
PowerFlex · Available
- Kaiser Permanente Morse Pharmacy30 ports
PowerFlex · Available
What kind of charging does Riverfront Plaza offer?
Of its 10 ports, 10 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.7 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.30 per kWh”. The site is listed as a multi-unit dwelling location.
How does Riverfront Plaza compare with other stations in Sacramento?
Sacramento has 535 charging stations in the DOE registry with 2,082 ports, the 6th-most of 812 cities and towns in California. Riverfront Plaza accounts for under 1% of the charging ports in Sacramento. Evolv Charging runs 4 stations in Sacramento. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Riverfront Plaza?
Evolv Charging operates 95 stations in the registry across 1 states, with 746 DC fast and 632 Level 2 ports in total. 95 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 16, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Sep 23, 2026.
Frequently asked questions
How many chargers does Riverfront Plaza have?
Riverfront Plaza has 10 charging ports: 10 Level 2.
Does Riverfront Plaza have DC fast charging?
No. The registry lists no DC fast ports here; its 10 ports are all Level 2.
What connectors does Riverfront Plaza have?
Riverfront Plaza has J1772 connectors.
Is charging at Riverfront Plaza free?
Pricing as reported to the DOE registry: $0.30 per kWh.
Is Riverfront Plaza open to the public?
Yes. Riverfront Plaza is listed with public access, and its status is available.
Where is Riverfront Plaza?
Riverfront Plaza is at 200 P St, Sacramento, CA 95814. Its coordinates are 38.57602, -121.50601.
More EV charging around Sacramento
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 470336, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Riverfront Plaza, Sacramento, CA (AFDC station 470336)”, https://chargecensus.com/stations/california/riverfront-plaza-470336 (data as of October 12, 2026).