ChargeCensus

Rinconada Library

Available

EV charging station in Palo Alto, California on the PowerFlex network — 3 Level 2. US DOE AFDC station 397996.

At a glance

Rinconada Library is a public EV charging station at 1213 Newell Rd in Palo Alto, California, on the PowerFlex network. It has 3 charging ports (3 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 6, 2025.

Total ports
3
DC fast
0
Level 2
3
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID397996
NetworkPowerFlex
StatusAvailable (E)
AccessPublic
FacilityLibrary
Open dateJun 6, 2025
Last updated at sourceJun 17, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.24 per kWh

Charging network

PowerFlex

Operates 253 stations in the DOE registry — view the full network →

Location

Address
1213 Newell Rd
ZIP
94303
Coordinates
37.44552, -122.13890

Within ~15 km

Nearby charging

What kind of charging does Rinconada Library offer?

Of its 3 ports, 3 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 20% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.24 per kWh”. The site is listed as a library location.

How does Rinconada Library compare with other stations in Palo Alto?

Palo Alto has 218 charging stations in the DOE registry with 981 ports, the 16th-most of 812 cities and towns in California. Rinconada Library accounts for under 1% of the charging ports in Palo Alto. PowerFlex runs 9 stations in Palo Alto. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Rinconada Library?

PowerFlex operates 253 stations in the registry across 6 states, with 145 DC fast and 4,527 Level 2 ports in total. 242 of those stations are in California, 1% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 6, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Jun 17, 2026.

Frequently asked questions

How many chargers does Rinconada Library have?

Rinconada Library has 3 charging ports: 3 Level 2.

Does Rinconada Library have DC fast charging?

No. The registry lists no DC fast ports here; its 3 ports are all Level 2.

What connectors does Rinconada Library have?

Rinconada Library has J1772 connectors.

Is charging at Rinconada Library free?

Pricing as reported to the DOE registry: $0.24 per kWh.

Is Rinconada Library open to the public?

Yes. Rinconada Library is listed with public access, and its status is available.

Where is Rinconada Library?

Rinconada Library is at 1213 Newell Rd, Palo Alto, CA 94303. Its coordinates are 37.44552, -122.13890.

More EV charging around Palo Alto

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 397996, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Rinconada Library, Palo Alto, CA (AFDC station 397996)”, https://chargecensus.com/stations/california/rinconada-library-397996 (data as of October 12, 2026).