ChargeCensus

Richland 50kw Abb Station 1

Available

EV charging station in Shafter, California on the ChargePoint network — 1 DC fast. US DOE AFDC station 387109.

At a glance

Richland 50kw Abb Station 1 is a public EV charging station at 511 Central Avenue in Shafter, California, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Mar 1, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID387109
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 1, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
511 Central Avenue
City
Shafter
ZIP
93263
Coordinates
35.50423, -119.27314

Within ~15 km

Nearby charging

What kind of charging does Richland 50kw Abb Station 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Richland 50kw Abb Station 1 compare with other stations in Shafter?

Shafter has 5 charging stations in the DOE registry with 48 ports. Richland 50kw Abb Station 1 accounts for 2% of the charging ports in Shafter. ChargePoint runs 2 stations in Shafter. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Richland 50kw Abb Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 1, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Richland 50kw Abb Station 1 have?

Richland 50kw Abb Station 1 has 1 charging port: 1 DC fast.

Does Richland 50kw Abb Station 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Richland 50kw Abb Station 1, with CCS connectors.

What connectors does Richland 50kw Abb Station 1 have?

Richland 50kw Abb Station 1 has CCS connectors.

Is Richland 50kw Abb Station 1 open to the public?

Yes. Richland 50kw Abb Station 1 is listed with public access, and its status is available.

Where is Richland 50kw Abb Station 1?

Richland 50kw Abb Station 1 is at 511 Central Avenue, Shafter, CA 93263. Its coordinates are 35.50423, -119.27314.

More EV charging around Shafter

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 387109, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Richland 50kw Abb Station 1, Shafter, CA (AFDC station 387109)”, https://chargecensus.com/stations/california/richland-50kw-abb-station-1-387109 (data as of October 12, 2026).