ChargeCensus

Redding Power Plant 1

Available

EV charging station in Redding, California, not on a charging network — 2 Level 2. US DOE AFDC station 325546.

At a glance

Redding Power Plant 1 is a private EV charging station at 17120 Clear Creek Rd in Redding, California, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 3, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Private
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID325546
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityUtility
Open dateJan 3, 2024
Last updated at sourceSep 14, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
17120 Clear Creek Rd
ZIP
96001
Coordinates
40.50961, -122.42433

Within ~15 km

Nearby charging

What kind of charging does Redding Power Plant 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location.

How does Redding Power Plant 1 compare with other stations in Redding?

Redding has 62 charging stations in the DOE registry with 240 ports. Redding Power Plant 1 accounts for under 1% of the charging ports in Redding. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Redding Power Plant 1?

Redding Power Plant 1 is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jan 3, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Sep 14, 2026.

Frequently asked questions

How many chargers does Redding Power Plant 1 have?

Redding Power Plant 1 has 2 charging ports: 2 Level 2.

Does Redding Power Plant 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Redding Power Plant 1 have?

Redding Power Plant 1 has J1772 connectors.

Is Redding Power Plant 1 open to the public?

No. Redding Power Plant 1 is listed with private access.

Where is Redding Power Plant 1?

Redding Power Plant 1 is at 17120 Clear Creek Rd, Redding, CA 96001. Its coordinates are 40.50961, -122.42433.

More EV charging around Redding

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 325546, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Redding Power Plant 1, Redding, CA (AFDC station 325546)”, https://chargecensus.com/stations/california/redding-power-plant-1-325546 (data as of October 12, 2026).