Rcea EV Network Sequoia Park 1
AvailableEV charging station in Eureka, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 437624.
At a glance
Rcea EV Network Sequoia Park 1 is a public EV charging station at 2391 Russell Street in Eureka, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 30, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 437624 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 30, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2391 Russell Street
- City
- Eureka
- State
- California
- ZIP
- 95503
- Coordinates
- 40.77692, -124.14231
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Arcata, CA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Northwood Chevrolet10 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Bayside Inn & Suites Eureka5 ports
EVCS · Available
What kind of charging does Rcea EV Network Sequoia Park 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Rcea EV Network Sequoia Park 1 compare with other stations in Eureka?
Eureka has 27 charging stations in the DOE registry with 91 ports. Rcea EV Network Sequoia Park 1 accounts for 2% of the charging ports in Eureka. ChargePoint runs 11 stations in Eureka. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Rcea EV Network Sequoia Park 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 30, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Rcea EV Network Sequoia Park 1 have?
Rcea EV Network Sequoia Park 1 has 2 charging ports: 2 Level 2.
Does Rcea EV Network Sequoia Park 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Rcea EV Network Sequoia Park 1 have?
Rcea EV Network Sequoia Park 1 has J1772 connectors.
Is Rcea EV Network Sequoia Park 1 open to the public?
Yes. Rcea EV Network Sequoia Park 1 is listed with public access, and its status is available.
Where is Rcea EV Network Sequoia Park 1?
Rcea EV Network Sequoia Park 1 is at 2391 Russell Street, Eureka, CA 95503. Its coordinates are 40.77692, -124.14231.
More EV charging around Eureka
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 437624, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Rcea EV Network Sequoia Park 1, Eureka, CA (AFDC station 437624)”, https://chargecensus.com/stations/california/rcea-ev-network-sequoia-park-1-437624 (data as of October 12, 2026).