Public Chargers Kiku 2-2
AvailableEV charging station in San Mateo, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 324935.
At a glance
Public Chargers Kiku 2-2 is a public EV charging station at 400 E 5th Ave in San Mateo, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 10, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 324935 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 10, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 400 E 5th Ave
- City
- San Mateo
- State
- California
- ZIP
- 94402
- Coordinates
- 37.56417, -122.31881
Within ~15 km
Nearby charging
- Google102 ports
ChargePoint · Available
- Volkswagen Group of America51 ports
PowerFlex · Available
Tesla Supercharger · Available
- Milbrae Station40 ports
AmpUp · Available
Tesla Destination · Available
- Genesis Marina36 ports
Blink · Available
What kind of charging does Public Chargers Kiku 2-2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Public Chargers Kiku 2-2 compare with other stations in San Mateo?
San Mateo has 286 charging stations in the DOE registry with 775 ports, the 9th-most of 812 cities and towns in California. Public Chargers Kiku 2-2 accounts for under 1% of the charging ports in San Mateo. ChargePoint runs 262 stations in San Mateo. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Public Chargers Kiku 2-2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 10, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Public Chargers Kiku 2-2 have?
Public Chargers Kiku 2-2 has 2 charging ports: 2 Level 2.
Does Public Chargers Kiku 2-2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Public Chargers Kiku 2-2 have?
Public Chargers Kiku 2-2 has J1772 connectors.
Is Public Chargers Kiku 2-2 open to the public?
Yes. Public Chargers Kiku 2-2 is listed with public access, and its status is available.
Where is Public Chargers Kiku 2-2?
Public Chargers Kiku 2-2 is at 400 E 5th Ave, San Mateo, CA 94402. Its coordinates are 37.56417, -122.31881.
More EV charging around San Mateo
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 324935, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Public Chargers Kiku 2-2, San Mateo, CA (AFDC station 324935)”, https://chargecensus.com/stations/california/public-chargers-kiku-2-2-324935 (data as of October 12, 2026).