Psf Atlas Unit E
Temporarily unavailableEV charging station in Monterey Park, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 357985.
At a glance
Psf Atlas Unit E is a public EV charging station at 588 Atlas Avenue in Monterey Park, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Oct 15, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 357985 |
| Network | ChargePoint |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Oct 15, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 588 Atlas Avenue
- City
- Monterey Park
- State
- California
- ZIP
- 91755
- Coordinates
- 34.03670, -118.11703
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
Non-networked · Available
- LADWP - Lincoln Heights District73 ports
Non-networked · Available
- Caltech - California Garage71 ports
PowerFlex · Available
Non-networked · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
What kind of charging does Psf Atlas Unit E offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Psf Atlas Unit E compare with other stations in Monterey Park?
Monterey Park has 16 charging stations in the DOE registry with 53 ports. Psf Atlas Unit E accounts for 4% of the charging ports in Monterey Park. ChargePoint runs 7 stations in Monterey Park. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Psf Atlas Unit E?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 15, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Psf Atlas Unit E have?
Psf Atlas Unit E has 2 charging ports: 2 Level 2.
Does Psf Atlas Unit E have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Psf Atlas Unit E have?
Psf Atlas Unit E has J1772 connectors.
Is Psf Atlas Unit E open to the public?
Yes. Psf Atlas Unit E is listed with public access, and its status is temporarily unavailable.
Where is Psf Atlas Unit E?
Psf Atlas Unit E is at 588 Atlas Avenue, Monterey Park, CA 91755. Its coordinates are 34.03670, -118.11703.
More EV charging around Monterey Park
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 357985, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Psf Atlas Unit E, Monterey Park, CA (AFDC station 357985)”, https://chargecensus.com/stations/california/psf-atlas-unit-e-357985 (data as of October 12, 2026).