Pine Vista - 1
AvailableEV charging station in Los Angeles, California on the Epic Charging network — 1 Level 2. US DOE AFDC station 351603.
At a glance
Pine Vista - 1 is a public EV charging station at 7032 Ramsgate Pl in Los Angeles, California, on the Epic Charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 1, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 351603 |
| Network | Epic Charging |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Jul 1, 2024 |
| Last updated at source | Jun 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.35 per kWh
Location
- Address
- 7032 Ramsgate Pl
- City
- Los Angeles
- State
- California
- ZIP
- 90045
- Coordinates
- 33.97339, -118.37311
Within ~15 km
Nearby charging
- LADWP - John Ferraro Building394 ports
Non-networked · Available
Non-networked · Available
Tesla Destination · Available
- Tesla Diner - Tesla Supercharger80 ports
Tesla Supercharger · Available
- Century Park Parking SW & NW79 ports
AmpUp · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
What kind of charging does Pine Vista - 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.35 per kWh”. The site is listed as a parking lot location.
How does Pine Vista - 1 compare with other stations in Los Angeles?
Los Angeles has 2,123 charging stations in the DOE registry with 10,316 ports, the most of 812 cities and towns in California. Pine Vista - 1 accounts for under 1% of the charging ports in Los Angeles. Epic Charging runs 2 stations in Los Angeles. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Pine Vista - 1?
Epic Charging operates 26 stations in the registry across 16 states, with 2 DC fast and 133 Level 2 ports in total. 8 of those stations are in California, under 1% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 1, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Jun 12, 2026.
Frequently asked questions
How many chargers does Pine Vista - 1 have?
Pine Vista - 1 has 1 charging port: 1 Level 2.
Does Pine Vista - 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Pine Vista - 1 have?
Pine Vista - 1 has J1772 connectors.
Is charging at Pine Vista - 1 free?
Pricing as reported to the DOE registry: $0.35 per kWh.
Is Pine Vista - 1 open to the public?
Yes. Pine Vista - 1 is listed with public access, and its status is available.
Where is Pine Vista - 1?
Pine Vista - 1 is at 7032 Ramsgate Pl, Los Angeles, CA 90045. Its coordinates are 33.97339, -118.37311.
More EV charging around Los Angeles
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 351603, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pine Vista - 1, Los Angeles, CA (AFDC station 351603)”, https://chargecensus.com/stations/california/pine-vista-1-351603 (data as of October 12, 2026).