ChargeCensus

Palos Verdes Mall

Available

EV charging station in Walnut Creek, California on the EVgo network — 6 DC fast. US DOE AFDC station 310873.

At a glance

Palos Verdes Mall is a public EV charging station at 1500 Palos Verdes Mall in Walnut Creek, California, on the EVgo network. It has 6 charging ports (6 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 17, 2023.

Total ports
6
DC fast
6
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310873
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateSep 17, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
1500 Palos Verdes Mall
ZIP
94597
Coordinates
37.92378, -122.08792

Within ~15 km

Nearby charging

What kind of charging does Palos Verdes Mall offer?

Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% above the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Palos Verdes Mall compare with other stations in Walnut Creek?

Walnut Creek has 77 charging stations in the DOE registry with 233 ports. Palos Verdes Mall accounts for 3% of the charging ports in Walnut Creek. EVgo runs 2 stations in Walnut Creek. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Palos Verdes Mall?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 17, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Palos Verdes Mall have?

Palos Verdes Mall has 6 charging ports: 6 DC fast.

Does Palos Verdes Mall have DC fast charging?

Yes. The registry lists 6 DC fast ports at Palos Verdes Mall, with CHAdeMO and CCS connectors.

What connectors does Palos Verdes Mall have?

Palos Verdes Mall has CHAdeMO and CCS connectors.

Is Palos Verdes Mall open to the public?

Yes. Palos Verdes Mall is listed with public access, and its status is available.

Where is Palos Verdes Mall?

Palos Verdes Mall is at 1500 Palos Verdes Mall, Walnut Creek, CA 94597. Its coordinates are 37.92378, -122.08792.

More EV charging around Walnut Creek

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310873, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Palos Verdes Mall, Walnut Creek, CA (AFDC station 310873)”, https://chargecensus.com/stations/california/palos-verdes-mall-310873 (data as of October 12, 2026).