P&T Coe
AvailableEV charging station in Berkeley, California on the ChargePoint network — 1 Level 2. US DOE AFDC station 283561.
At a glance
P&T Coe is a public EV charging station at Soule Road in Berkeley, California, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 23, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 283561 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 23, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- Soule Road
- City
- Berkeley
- State
- California
- ZIP
- 94709
- Coordinates
- 37.87441, -122.25942
Within ~15 km
Nearby charging
- Zum Services, Inc.74 ports
Non-networked · Available
- Adobe - SF Office - Phase 152 ports
PowerFlex · Available
- Pacific Renaissance Plaza Garage40 ports
Flash · Available
- Airport Corporate Center36 ports
PowerFlex · Available
- Rotunda Garage33 ports
Flash · Available
Flash · Available
What kind of charging does P&T Coe offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does P&T Coe compare with other stations in Berkeley?
Berkeley has 148 charging stations in the DOE registry with 319 ports, the 23rd-most of 812 cities and towns in California. P&T Coe accounts for under 1% of the charging ports in Berkeley. ChargePoint runs 94 stations in Berkeley. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates P&T Coe?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does P&T Coe have?
P&T Coe has 1 charging port: 1 Level 2.
Does P&T Coe have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does P&T Coe have?
P&T Coe has J1772 connectors.
Is P&T Coe open to the public?
Yes. P&T Coe is listed with public access, and its status is available.
Where is P&T Coe?
P&T Coe is at Soule Road, Berkeley, CA 94709. Its coordinates are 37.87441, -122.25942.
More EV charging around Berkeley
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 283561, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “P&T Coe, Berkeley, CA (AFDC station 283561)”, https://chargecensus.com/stations/california/p-t-coe-283561 (data as of October 12, 2026).