ChargeCensus

Oxnard Stations Oxnard Fast 1

Available

EV charging station in Oxnard, California on the ChargePoint network — 1 DC fast. US DOE AFDC station 232923.

At a glance

Oxnard Stations Oxnard Fast 1 is a public EV charging station at 5601 Edison Dr in Oxnard, California, on the ChargePoint network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Oct 5, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID232923
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 5, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5601 Edison Dr
City
Oxnard
ZIP
93033
Coordinates
34.14664, -119.16846

Within ~15 km

Nearby charging

What kind of charging does Oxnard Stations Oxnard Fast 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Oxnard Stations Oxnard Fast 1 compare with other stations in Oxnard?

Oxnard has 98 charging stations in the DOE registry with 225 ports. Oxnard Stations Oxnard Fast 1 accounts for under 1% of the charging ports in Oxnard. ChargePoint runs 80 stations in Oxnard. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Oxnard Stations Oxnard Fast 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 5, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Oxnard Stations Oxnard Fast 1 have?

Oxnard Stations Oxnard Fast 1 has 1 charging port: 1 DC fast.

Does Oxnard Stations Oxnard Fast 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Oxnard Stations Oxnard Fast 1, with CCS connectors.

What connectors does Oxnard Stations Oxnard Fast 1 have?

Oxnard Stations Oxnard Fast 1 has CCS connectors.

Is Oxnard Stations Oxnard Fast 1 open to the public?

Yes. Oxnard Stations Oxnard Fast 1 is listed with public access, and its status is available.

Where is Oxnard Stations Oxnard Fast 1?

Oxnard Stations Oxnard Fast 1 is at 5601 Edison Dr, Oxnard, CA 93033. Its coordinates are 34.14664, -119.16846.

More EV charging around Oxnard

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 232923, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Oxnard Stations Oxnard Fast 1, Oxnard, CA (AFDC station 232923)”, https://chargecensus.com/stations/california/oxnard-stations-oxnard-fast-1-232923 (data as of October 12, 2026).