ChargeCensus

Outlets at Lake Elsinore

Available

EV charging station in Lake Elsinore, California on the EVgo network — 2 DC fast. US DOE AFDC station 228568.

At a glance

Outlets at Lake Elsinore is a public EV charging station at 17600 Collier Ave in Lake Elsinore, California, on the EVgo network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 7, 2018.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID228568
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateMar 7, 2018
Last updated at sourceOct 11, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
17600 Collier Ave
ZIP
92530
Coordinates
33.70058, -117.35212

Within ~15 km

Nearby charging

What kind of charging does Outlets at Lake Elsinore offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about half of the California average of 3.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Outlets at Lake Elsinore compare with other stations in Lake Elsinore?

Lake Elsinore has 15 charging stations in the DOE registry with 67 ports. Outlets at Lake Elsinore accounts for 3% of the charging ports in Lake Elsinore. It is the only EVgo station in Lake Elsinore. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Outlets at Lake Elsinore?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 7, 2018, one of 330 stations in California with a 2018 open date. The station's record was last updated at the source on Oct 11, 2026.

Frequently asked questions

How many chargers does Outlets at Lake Elsinore have?

Outlets at Lake Elsinore has 2 charging ports: 2 DC fast.

Does Outlets at Lake Elsinore have DC fast charging?

Yes. The registry lists 2 DC fast ports at Outlets at Lake Elsinore, with CHAdeMO and CCS connectors.

What connectors does Outlets at Lake Elsinore have?

Outlets at Lake Elsinore has CHAdeMO and CCS connectors.

Is Outlets at Lake Elsinore open to the public?

Yes. Outlets at Lake Elsinore is listed with public access, and its status is available.

Where is Outlets at Lake Elsinore?

Outlets at Lake Elsinore is at 17600 Collier Ave, Lake Elsinore, CA 92530. Its coordinates are 33.70058, -117.35212.

More EV charging around Lake Elsinore

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 228568, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Outlets at Lake Elsinore, Lake Elsinore, CA (AFDC station 228568)”, https://chargecensus.com/stations/california/outlets-at-lake-elsinore-228568 (data as of October 12, 2026).