ChargeCensus

Nineteen800

Available

EV charging station in Cupertino, California on the EVgo network — 2 DC fast · 1 Level 2. US DOE AFDC station 228562.

At a glance

Nineteen800 is a public EV charging station at 19800 Vallco Pkwy in Cupertino, California, on the EVgo network. It has 3 charging ports (2 DC fast · 1 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Jan 21, 2016.

Total ports
3
DC fast
2
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID228562
NetworkEVgo
StatusAvailable (E)
AccessPublic
Open dateJan 21, 2016
Last updated at sourceOct 11, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EVgo

Operates 1,220 stations in the DOE registry — view the full network →

Location

Address
19800 Vallco Pkwy
ZIP
95014
Coordinates
37.32514, -122.01139

Within ~15 km

Nearby charging

What kind of charging does Nineteen800 offer?

Of its 3 ports, 2 are DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 20% below the California average of 3.7 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Nineteen800 compare with other stations in Cupertino?

Cupertino has 91 charging stations in the DOE registry with 259 ports. Nineteen800 accounts for 1% of the charging ports in Cupertino. EVgo runs 3 stations in Cupertino. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Nineteen800?

DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 21, 2016, one of 191 stations in California with a 2016 open date. The station's record was last updated at the source on Oct 11, 2026.

Frequently asked questions

How many chargers does Nineteen800 have?

Nineteen800 has 3 charging ports: 2 DC fast · 1 Level 2.

Does Nineteen800 have DC fast charging?

Yes. The registry lists 2 DC fast ports at Nineteen800, with CHAdeMO and CCS connectors.

What connectors does Nineteen800 have?

Nineteen800 has CHAdeMO, J1772 and CCS connectors.

Is Nineteen800 open to the public?

Yes. Nineteen800 is listed with public access, and its status is available.

Where is Nineteen800?

Nineteen800 is at 19800 Vallco Pkwy, Cupertino, CA 95014. Its coordinates are 37.32514, -122.01139.

More EV charging around Cupertino

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 228562, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Nineteen800, Cupertino, CA (AFDC station 228562)”, https://chargecensus.com/stations/california/nineteen800-228562 (data as of October 12, 2026).